Everett, WA · Snohomish County · Population ~115,000 (2nd-Largest WA City; Snohomish County Seat) · WA HB 1217 RCW §59.18.700 9.683% Cap · Commerce Prescribed Form Required · First-Year No-Increase Protection · 12-Year New-Construction Exemption · Cap Sunsets 2040 · 180-Day Advance Notice · 21-Day Deposit Return 2× Penalty · 14-Day Pay-or-Quit · Boeing Everett 472M Cubic Feet World’s Largest Building · Naval Station Everett Deepwater Pier · Providence Regional Level II Trauma · Sound Transit Lynnwood Link 2024
Everett WA rent increase 2026 Everett, Washington — Snohomish County seat (~115,000; 2nd-largest WA city) — is subject to Washington HB 1217 (RCW §59.18.700): 9.683% cap for 2026 (7% + 2.683% Seattle-Tacoma-Bellevue CPI-U; same cap as Seattle and Tacoma). Washington State Commerce Department prescribed form required for all covered notices — non-conforming notices void. No increase in first 12 months of any tenancy. 12-year new-construction exemption (post-2014 first CoC exempt). 180 days’ advance notice required. WA RLTA: no deposit cap; 21-day return; 2× wrongful withholding. 14-day pay-or-quit notice; Snohomish County Superior Court (3000 Rockefeller Ave). Home to the Boeing Everett Factory (world’s largest building by volume; 747/777/787; ~30,000+ Snohomish County workers) and Naval Station Everett (only Puget Sound deepwater pier south of Bangor; ~10,000 military+civilian).
Everett, Washington — home of the world’s largest building, one of the Pacific Fleet’s most important naval installations, and a growing tech-economy spillover market driven by Sound Transit light rail connectivity — is subject to Washington’s first-ever residential rent cap under HB 1217 (effective July 1, 2025).
The 2026 cap is 9.683% for covered units; all increase notices must use the Washington State Department of Commerce prescribed form or they are void. At least 180 days’ advance written notice is required — double Oregon’s 90-day requirement and six times California’s standard 30-day notice.
Washington HB 1217: Everett’s first rent cap
Washington State HB 1217 (codified at RCW §59.18.700) was signed by Governor Inslee in April 2024 and became effective July 1, 2025 — the first residential rent cap in Washington State history. Everett, as a Snohomish County city, is fully subject to HB 1217.
The 2026 cap is 9.683% — the sum of 7% fixed plus the 2.683% change in the Seattle-Tacoma-Bellevue CPI-U for the 12 months ending June 2025. This is identical to the Seattle and Tacoma cap; Washington uses a single regional CPI rather than jurisdiction-specific figures.
- Cap: 9.683% maximum per 12-month period per unit.
- Prescribed form: use the Washington Department of Commerce form only. Non-conforming notices are void regardless of the increase amount.
- 180-day advance notice required (RCW §59.18.700(5)).
- First-year protection: no increase permitted in the first 12 months of any tenancy.
- 12-year new-construction exemption: buildings with first certificate of occupancy in 2014 or later are exempt through 2026.
- Sunset: July 1, 2040. HB 1217 expires unless renewed by the Legislature.
The Commerce Department prescribed form: a critical compliance step
Unlike Oregon and California, which allow any written notice, Washington HB 1217 requires landlords to use the specific form published by the Washington State Department of Commerce. This is an operationally significant requirement:
- Using the wrong form = void notice. Even if the increase is within the 9.683% cap, a notice on the landlord’s own letterhead, a property management template, or a form from a prior year is void and cannot be enforced.
- The prescribed form must identify: the property address, current rent, proposed new rent, percentage increase, effective date, and the tenant’s right to dispute an over-cap increase.
- Download the current form from commerce.wa.gov before serving any covered increase notice. The form is updated annually.
Penalty for over-cap increases: RCW §59.18.700(7) provides that the over-cap portion of a notice is void; a tenant who paid the excess may recover it plus additional damages and attorney fees.
Washington RLTA security deposit rules
Washington Residential Landlord-Tenant Act (RCW §59.18.270–§59.18.285) governs Everett security deposits, as amended in 2022:
- No deposit cap. Washington imposes no maximum. Everett market practice: 1–2 months’ rent.
- Return deadline: 21 days after the tenant vacates and provides a forwarding address (both conditions required).
- Itemized statement required with receipts for deductions over $600. Normal wear and tear is not deductible.
- Wrongful withholding penalty: 2× the deposit or wrongfully withheld portion, plus attorney fees (RCW §59.18.280(1)).
- Move-in checklist required (RCW §59.18.260): failure to provide eliminates deduction rights.
Everett eviction: the 14-day pay-or-quit notice
Washington RLTA (RCW §59.12.030(3), as amended by 2021 ESHB 1236) requires a 14-Day Notice to Pay Rent or Vacate before filing an Unlawful Detainer (UD) action.
After the 14-day period: file UD summons and complaint in Snohomish County Superior Court (3000 Rockefeller Ave, Everett WA 98201; filing fee ~$200–$250). Hearing approximately 10–30 days after service of summons. If the court issues a Writ of Restitution, the Snohomish County Sheriff executes the lockout. Total uncontested timeline: approximately 4–7 weeks from the 14-day notice.
Military tenants (NSE): SCRA 50 U.S.C. §3955 protections apply to active-duty service members receiving PCS orders. Consult Naval Legal Service Office (NLSO) Pacific Northwest before serving eviction notices on NSE personnel.
Boeing Everett Factory: world’s largest building
The Boeing Everett Factory (3003 W. Casino Rd, Everett WA 98204) is the largest building in the world by volume at 472 million cubic feet (98.7 acres of floor space; 1,000×1,600 feet in plan; four stories at its main assembly bays). The Guinness Book of World Records has recognized it as the world’s largest building by volume since 1968.
The Everett plant assembles:
- Boeing 777 / 777X: 302-foot wingspan twin-engine wide-body; approximately 1,700 777s delivered; 777X certification ongoing as of 2026 (GE9X engine; carbon fiber composite wings).
- Boeing 787 Dreamliner: partially shifted to North Charleston SC (787-8, -9) but Everett remains a production and delivery site for certain 787-10 configurations.
- Boeing 767 (KC-46 Tanker): US Air Force air-refueling tanker program; Everett primary production site; multi-decade DoD contract.
Boeing directly employs approximately 25,000–32,000 workers in Snohomish County (machinists under IAM Local 751 and W24; engineers under SPEEA), with an estimated 35,000–50,000 total jobs including supplier co-location. Boeing machinists earned $35–$60/hour under the 2024 contract; engineers earn $80,000–$200,000+. The range of Boeing worker wages creates layered demand across Everett’s entire rental price spectrum.
Naval Station Everett and the military rental market
Naval Station Everett (2000 W. Marine View Dr, Everett WA 98207) is the only deepwater naval pier in Puget Sound south of Naval Base Kitsap Bangor. NSE serves as home port for the USS Abraham Lincoln (CVN-72) Carrier Strike Group — a Nimitz-class nuclear-powered aircraft carrier — and associated surface warfare combatants.
Approximately 8,000–12,000 military personnel and 3,000–5,000 DoD civilian employees are associated with NSE. 2026 BAH rates for Snohomish County (Seattle-Tacoma-Bellevue OHA): E-4 with dependents approximately $2,700–$2,950/month; O-3 with dependents approximately $3,900–$4,300/month. NSE military personnel drive strong year-round rental demand in the $1,200–$2,000 price range in Everett, Marysville, and Mukilteo.
Sound Transit Lynnwood Link: the rental market inflection
Sound Transit’s Lynnwood Link extension (opened September 2024) extended the 1 Line (formerly the light rail extension of Puget Sound) from Northgate in Seattle north through Shoreline, Mountlake Terrace, and Lynnwood. The extension connects Snohomish County to downtown Seattle in approximately 35–45 minutes, dramatically improving Everett-area transit access.
The Sound Transit East Link extension from the Lynnwood terminus to Everett (Future System Expansion; expected mid-2030s pending final funding) will further integrate Everett into the regional transit network. Even at current connectivity levels, commuters who park at Lynnwood Transit Center and take the 1 Line have reported increased willingness to rent in Everett and Snohomish County rather than Seattle proper, contributing to the demand growth that drove HB 1217’s passage.
Related Washington & rent increase resources
- Seattle WA rent control 2026 — WA HB 1217 9.683% cap; Commerce prescribed form; same cap as Everett; King County market overview
- Tacoma WA rent increase 2026 — WA HB 1217 9.683% cap; JBLM military market; Pierce County Superior Court
- Bellevue WA rent increase 2026 — Microsoft/Amazon east side; same 9.683% cap; King County
- Spokane WA rent increase 2026 — Eastern Washington; HB 1217 applies; different CPI region
- Washington State rent cap 2026 — HB 1217 statewide overview; Commerce form download; all WA exemptions
- Oregon rent increase 2026 calculator — Oregon’s ORS §90.600 9.5% cap comparison; 90-day vs. 180-day notice contrast
Calculate your Everett rent ceiling — free for 1 unit
RentCeiling covers all Washington State cities including Everett, Seattle, Tacoma, and Bellevue under HB 1217. Enter your Everett unit to verify the 9.683% 2026 cap, confirm your 12-year new-construction exemption status, and document your 180-day notice with a timestamped compliance log entry. The prescribed-form requirement makes compliance documentation especially critical in Washington.
Try the free calculator